Delivered projects

Projects from 2025–2026. Part of this work was delivered in partnership with an international consulting firm. Some clients are not disclosed under confidentiality agreements.

Aviation

Strategy consulting Client: Ministry of Transport of the Republic of Kazakhstan

Aviation sector development plan

Format: Joint project with an international consulting firm

Context and objective

Kazakhstan’s aviation sector holds a unique geographic advantage: the country sits at the centre of Eurasia, within narrow-body range of major markets. Yet the sector had no single strategic plan — airport infrastructure in most cities required large-scale modernisation, and the country’s transit potential remained untapped.

What we did

  • Benchmarking of leading regional hubs: Dubai, Istanbul, Tashkent
  • A Eurasian transit hub model developed with a full economic case
  • Prioritisation of infrastructure projects across the country’s airports
  • A plan across 5 workstreams: ICAO safety, infrastructure, jet fuel, fleet and traffic

Outcome

  • The plan was adopted by the Ministry of Transport
  • An airport infrastructure modernisation programme was approved
  • Decisions were taken on building a new aviation hub and consolidating aircraft orders
Strategy and financial consulting Client: Transport infrastructure operator

Financial diagnostic and sustainability strategy

Format: Joint project with an international consulting firm

Context and objective

The client is an infrastructure operator with its own revenue, derived from a regulated tariff, and a large investment programme. Recent revenue growth had been driven by external factors — redirected client flows and currency effects — was temporary in nature, and had begun to normalise. A large investment programme and non-core cost burden created the risk of a liquidity gap.

What we did

  • Financial diagnostic: decomposition of revenue drivers (organic growth versus temporary and currency effects) and quantification of the liquidity gap
  • Forecast and tariff strategy: revenue forecast across 3 scenarios to 2030, tariff benchmarking against 20+ peers, phased adjustment
  • Financing and optimisation: structuring of loans and state support measures, cost reduction, investment programme control
  • Commercial growth initiatives: client base expansion and data-driven tariff management

Outcome

  • The rationale was accepted by the line ministry for presentation at sector leadership level
  • A phased tariff increase was substantiated without loss of competitiveness or user attrition
  • A comprehensive financing package closing the liquidity gap was assembled
  • Long-term financial sustainability through 2030 was confirmed
Strategy consulting Client: Ministry of Transport of the Republic of Kazakhstan

Target international route network

Format: Spectrum Solutions project

Context and objective

The international route network had grown from individual carrier requests and one-off arrangements, without an overall architecture. There were no criteria establishing why one destination mattered more than another, and no answer as to which markets contributed most to the transit potential of the country’s hubs. Decisions were taken case by case, and carrier support was allocated without a comparable basis.

What we did

  • A selection funnel was built: from the full global list of cities with airports down to a shortlist, filtering by flight radius from the Kazakh hubs and by destination airport size
  • Selection applied five criteria: passenger traffic, population, trade turnover, political significance and continuity with the existing network
  • A city network-potential model was developed — scoring origin–destination pairs routed through a Kazakh hub, weighing demand against geographic advantage
  • The target network was allocated between the two hubs and compared with the current one: what is already served and what remains to be opened
  • A four-step route launch methodology was established: traffic rights, slots at the destination airport, carrier selection, and effect monitoring

Outcome

  • The target international network was adopted as the basis for the Ministry’s further work
  • Destinations were assigned to three priority tiers with a defined sequence of openings
  • Carrier support was moved onto a comparable basis: the route goes to the carrier requesting the least support at the required frequency
  • A mechanism was established to compare investment per destination against cumulative effect
Strategy and financial consulting Client: Ministry of Transport of the Republic of Kazakhstan

Capital cost benchmarking of airport projects

Format: Spectrum Solutions project

Context and objective

Airport project costs were assessed in absolute terms, which made it impossible to compare assets of different size either with each other or with international peers. Without a comparable basis there was no answer to the underlying question: is this project expensive, or normal for its class?

What we did

  • Cost lines with a comparable basis were isolated — airfield infrastructure and terminal, which account for a material share of total cost
  • Unit metrics were introduced: cost per square metre of terminal, per square metre of airfield pavement, and per unit of throughput capacity
  • A Kazakh peer base was assembled from disclosed new-build and reconstruction projects
  • An international peer base was assembled from comparable regional airports and international terminal projects
  • Both bases were applied and the cost lines with the largest deviation identified

Outcome

  • A methodology applicable to any new airport project was established
  • The cost lines driving the principal deviation from comparable projects were identified
  • The client gained grounds to revise project parameters before the financing stage
Sector analysis Client: Ministry of Transport of the Republic of Kazakhstan

Jet fuel market analysis

Format: Spectrum Solutions project

Context and objective

The cost of jet fuel constrains route network development: a carrier has little reason to open a route where refuelling costs more than at a competing hub. Yet no decomposition existed showing where the price gap actually arises — in production, in logistics, or at the infrastructure stage.

What we did

  • Consumption structure across the country’s airports was analysed, together with a demand forecast
  • The balance of domestic production and imports was assessed and supply routes identified
  • The split between the subsidised and market segments was broken out
  • The final price was decomposed along the supply chain — from the border price through to refuelling at the airport — quantifying the contribution of each link

Outcome

  • Levers for reducing cost were identified: raising domestic refinery output, reducing intermediate links, and capping mark-ups at the infrastructure stage
  • Requirements for storage and delivery infrastructure were substantiated against target consumption
  • The analysis was used in shaping sector decisions

Road transport and roads

Strategy consulting Client: Ministry of Transport of the Republic of Kazakhstan

Road infrastructure development plan

Format: Joint project with an international consulting firm

Context and objective

Kazakhstan’s road network is among the largest in the region. International freight volumes grew steadily, yet transit potential remained unrealised. The sector needed a plan built on an economic rationale for infrastructure investment, together with instruments to recover that investment.

What we did

  • A prioritised portfolio of transit corridors was defined
  • A differentiated approach to pavement design and life-cycle cost optimisation was developed
  • Monetisation instruments introduced: toll sections, per-kilometre charging, green corridor and fuel levy
  • A border crossing modernisation programme prepared to cut transit times and raise throughput

Outcome

  • The strategy was adopted by the Government of Kazakhstan
  • A major investment portfolio was formed
  • Monetisation instruments with significant revenue potential were developed
Strategy consulting Client: Ministry of Transport of the Republic of Kazakhstan

Road transport sector development plan

Format: Spectrum Solutions project

Context and objective

International road haulage is the transport segment with the largest untapped potential in Kazakhstan. Access to key markets is constrained by the permit system, a significant share of carriers operates outside a transparent tax regime, and the freight fleet requires renewal. The sector had no single plan linking these three tasks together.

What we did

  • A transition to a permit-free regime with priority partner countries was worked through, together with a negotiation plan for new markets
  • A mechanism for carrier transparency was proposed, based on integrating data held by state bodies
  • Instruments for renewing the freight fleet were developed, including a subsidised leasing mechanism
  • A border crossing modernisation programme was prepared with a target clearance time

Outcome

  • The plan was adopted by the Ministry of Transport
  • Sector targets to 2030 were defined
  • A list of delivery mechanisms with assigned owners was established
Strategy and operations consulting Client: National infrastructure operator

Operating model and organisational transformation

Format: Joint project with an international consulting firm

Context and objective

The client is an operating company with its own balance sheet, investment programme and revenue, yet it functioned largely as a technical client for construction and maintenance works. At the same time it held substantial untapped potential to monetise infrastructure and raise financing independently. Delivering the sector strategy required a comprehensive transformation of its operating model.

What we did

  • A target operating model across 5 workstreams: financing, revenue generation, project management, digitalisation and organisational change
  • A roadmap prepared for transferring infrastructure onto the balance sheet as collateral for IFI lending
  • Bond issuance instruments designed for long-term financing
  • More than 10 sources of additional revenue identified

Outcome

  • The target operating model was adopted by company management
  • New revenue sources with significant aggregate potential were identified
  • A model for raising financing independently was established